Power supply is one of the top killers of businesses in the digital economy.
In an environment where the pace of business is increasing and with the tightening of regulatory norms, digital businesses are being forced to adopt new processes and technologies to stay ahead of the competition.
Uninterrupted power supply (UPS) and data center are two of the most common challenges that many businesses are facing.
UPS is a measure taken to ensure that the power supply to the sensitive electronics within a building is uninterrupted. When a business installs a UPS, it is essentially protecting its sensitive equipment from outages in the power supply.
Data center is a central place that stores its company’s data and software. It is essential for the smooth functioning of business and is often the first point of entry for users.
1-Plan for backup before you plan for the power supply
Before you even think of building a data center, you should have a backup plan in place. You should have a place where you can store your backups and ensure that they are regularly backed up. A UPS alone will not be able to protect your data center from a power outage. You need to have a backup plan that includes a backup generator, back-ups and a backup plan.
2-Don’t opt for the biggest
If you are planning to have a UPS, don’t just go for the biggest you can buy. You need to have a certain amount of electricity that will flow into your UPS in a day. So, if you go for a UPS that has a capacity of 1000 VA, then you have to have 100 VA coming in from the grid every day. If your requirement is less than that, then you can’t use a UPS that has a capacity of 1000 VA.
3-Make sure of your Surge Protection Requirements
As a business grows and their requirement for power increases, they might have to add floors and rooms to their existing building. This might mean that you have to add some power protection requirements to the building. For example, you can add UPS capacity for the new floor that you are planning to add and also add a surge protection requirement for your entire building. You can do this by adding a UPS onto the common building fuse or by adding a UPS in your data center.
4-Invest in Data Center Power Optimization
Data centers consume a lot of power. So, it is essential to optimize the power consumption in your data center. You can do this by investing in data center power optimization. You can also hire a consultant who can help you optimize your power consumption. Data center power optimization can help you save a lot of money by reducing the energy used in your data center. It can also help you meet regulatory requirements and maintain a secure environment for your employees.
5-Don’t Rely on Manual Overrides
The majority of businesses rely on manual overrides to protect their sensitive equipment. And this is one of the biggest challenges with this. If a manual override fails, the business has to close down. So, manual overrides need constant monitoring, and if there is a power outage, then you have to close down your business. So, there is no way that manual overrides can be a reliable method of protecting your sensitive equipment.
6-Consistently Test the Network
Network incidents can lead to many problems for a business. For example, if the network is not working as it is supposed to, then it might lead to a power outage. So, you need to make sure that the network is regularly tested to ensure that there are no hiccups in their functioning. One effective way of testing the network is to use network traffic analyzers. They come with software that can help you test the network regularly.
7-Make a note of your requirement
When it comes to power supply, it is essential for businesses to make a note of their requirement. You need to keep a track of the power consumption in your data center and also keep a track of your planned requirement. You can do this by using a network monitoring tool. This will help you keep a track of your network consumption and also let you know how much power you are using every month.
8-Don’t forget to install cooling
One of the biggest challenges that businesses face when it comes to power supply is the lack of cooling. In data centers and server rooms, there is no cooling. So, you need to make sure that the UPS or generator provides you with the required cooling. This is what is called power conditioning with a cooling module. This way, you have effectively used the UPS to provide backup power and the generator to provide backup power and a load switch to provide backup power and cooling. This is what is called power conditioning with a cooling module.
9-Lastly, Keep track
It is important to keep track of your usage and your planned requirement. This will help you avoid any issues and also let you know if there is a need for any kind of amendment in the future, you can make the right decision.
Wrapping it up
Imagine the scenario — you’re in the middle of a crunch project and the clock is ticking. With power and internet failures occurring in your data center, getting work done has become difficult. You need to get some work done and reconnect with your development team as soon as possible. In order to make this happen, you need uninterrupted power and data center.
Uninterrupted power supply and data center are essential for any business. These two things are paramount to the success of any business.